Cabinet Installation Day 1
We came home after cabinet installation day 1 to find the sink area of the kitchen completely installed. The stove area had not made as much progress, but that’s ok.
Since we have crazy tall ceilings in our place, we went with the 42″ cabinets on top. Man those things are TALL! We’re going to have to keep a footstool around so I can reach the top shelf…
The cabinets are from Home Depot. They’re Thomasville with a Cabbott door. The wood is maple with the cider stain.






I am Jen the Beantown Baker. Engineer by day and baking maven by night. Hubby serves as my #1 fan and official taste tester. We got hitched back in 2006. Barefoot. In the sand. With the waves crashing behind us. It was one of the best decisions we’ve ever made. 


This has to be so exciting fo ryou guys! How much longer until all done? Can’t wait to see it completed!
~ingrid
btw, congrats on your own domain name!
Thanks Ingrid!! We’re hoping the cabinets will be done today. The granite guys come Thursday to make the template. Then it’s 1-3 weeks for them to make the granite. Once the granite goes in, the plumber/electrician come back to hook everything up! So we’re hoping things will be done in about 2 weeks!
Congrats and everything is coming along!!